EliteShires Property Services tiles bathrooms, showers, kitchens and floors in Harrow, Kenton, Stanmore and Edgware, priced per square metre against a written scope. Showers and wet rooms are tanked with a waterproof membrane before any tile goes on, because grout is not waterproof. Most bathrooms take two to three days, and we will tell you when regrouting would do the job instead of retiling.
A shower that has started staining the ceiling below, grout that has cracked again a year after it was last done, or a bathroom that needs tiling and a quote that has not mentioned tanking once.
Tiling fails for two reasons: the substrate was not right, and the wet area was not tanked. Both are invisible once the tiles are on, which is why the cheapest tiling quote is so often the most expensive outcome.
Tiling at a glance
| Pricing | Per square metre, against a written scope |
|---|---|
| Typical bathroom | 2–3 days |
| Showers and wet rooms | Tanked before any tile goes on |
| Repairs | Regrouting and tile replacement where it will last |
What tiling with us includes
- Substrate preparation, overboarding and levelling
- Tanking of showers and wet areas
- Wall and floor tiling in ceramic, porcelain and natural stone
- Setting out from the sightline, not the easiest corner
- Grouting and silicone to the correct joints
- Regrouting and tile replacement as a repair option
Preparation and substrate
Tiles are only as good as what they are stuck to. That means checking the wall or floor is sound, flat and rigid, overboarding where plasterboard flexes, priming as required, and levelling floors before anything is laid. Tiling straight onto a flexing or dusty surface is why tiles crack and grout lines open up.
Why do wet areas need tanking?
Showers and wet rooms need a waterproof membrane behind the tiles. Grout is not waterproof and never has been. Tanking is a small proportion of the cost of a bathroom and it is the single difference between a shower that lasts and a ceiling stain downstairs in two years.
