EliteShiresProperty Services
Hands with home-inspection checklist on clipboard

Northwood, HA6

PAT Testing in Northwood

Appliance tests for furnished HA6 lets, dated for Hillingdon's licence forms.

  • Free, no-obligation quotes
  • Certificate and asset register on the day
  • Price confirmed before we attend
  • Certificates and repairs on one account
Or request a quote online
  • On the dayCertificate and asset register at the visit
  • Price firstConfirmed before we attend
  • HA6Northwood postcodes
Red-brick detached Arts and Crafts style house behind hedge and lawn

In short

Do Northwood landlords have to PAT test?

For an ordinary single-household let, no law requires it. For a shared house licensed by Hillingdon, the paperwork effectively does: the online application for an additional HMO licence asks for a portable appliance test certificate dated within the last 12 months. We test in Northwood and leave the certificate and register on the day.

HSE's view is that the frequency of testing should follow the risk, not a fixed annual rule. Hillingdon's form sets the date that matters for a licence application.

The full guide is on our PAT Testing (Portable Appliance Testing) page, and everything else we do locally is under landlord certificates and repairs in Northwood.

Request a quote

PAT Testing in Northwood: what is different here

What Hillingdon's licence asks for, item by item

Three separate demands sit behind a Northwood HMO licence. At application, Hillingdon's proposed conditions want a declaration that supplied appliances are safe and in good working order, and the online form asks for a PAT certificate dated within the last 12 months. During the licence, the council can ask for test reports on the appliances, and a PAT report, within 14 days.

Underneath both, Schedule 4 of the Housing Act 2004 makes every licence require the holder to keep supplied appliances safe and to give a declaration on demand. One register listing every item by room, with its result and the date, answers all three.

  • Declaration of appliance safety with the application
  • PAT certificate dated within 12 months on the application form
  • Test reports to the council within 14 days of a demand
  • Register kept by room so items can be traced

Furnished lets for Mount Vernon staff

Mount Vernon Cancer Centre on Rickmansworth Road, run by East and North Hertfordshire NHS Trust, sits on the western edge of Northwood, and furnished rooms and flats suit people working there on fixed-length contracts. A furnished let means more landlord appliances: kettle, toaster, microwave, vacuum, lamps, a television, sometimes a fridge in each room of a shared house.

NHS England consulted from January to March 2026 on moving the cancer centre to a new site beside Watford General Hospital. The trust's page, updated in September 2026, says a decision-making business case is being prepared and that there are no short-term changes to where patients are treated.

Shared kitchens in converted family houses

When a large Northwood house becomes a home for five or six sharers, the kitchen becomes the busiest room on any circuit: several kettles, two microwaves, an air fryer each. Tenant-owned items are their own responsibility, but overloaded extension leads and adaptors in a shared kitchen are a fire risk the licence holder will be asked about at an inspection.

We test what you supply, label each item, and note any tenant equipment running from your extension leads so you can raise it. Hillingdon's proposed conditions expect property inspections at reasonable intervals, typically every six months, which gives a natural point to look again.

Garden rooms, garages and outdoor kit

Big HA6 plots come with appliances outside the house: a mower or pressure washer left for tenants, a dehumidifier in a garage, a patio heater, a chest freezer in a garden room. If you leave it for the tenant to use, it is a supplied appliance and belongs on the register.

Equipment used outdoors takes knocks and damp, so it is a sensible place to test more often than a kettle in the hall. Anything you would rather not maintain is better removed before the tenancy starts than left with a note saying not to use it.

Fixed equipment belongs on the EICR, not the PAT register

In Northwood's electric-only flats, the storage heaters, the immersion heater, a hard-wired cooker and an electric shower are fixed equipment. They are covered by the EICR, not by portable appliance testing, and a PAT label on a storage heater proves nothing. Where a house has both, booking the two together saves a day: tenants are disturbed once, and if a socket circuit trips during testing the electrician can tell straight away whether the fault is in the appliance or the wiring.

Hillingdon's application asks for both documents, so keeping their dates close keeps the renewal simple.

Official sources

Last reviewed October 2026 by EliteShires Property Services.

Price and booking

Certificates and defined jobs are a fixed price confirmed before we attend; repairs are charged by the hour, with the rate and an estimate confirmed before we attend. On our PAT testing page: what a visit includes, step by step.

Every job is photographed before and after, and you get a time slot rather than a morning-or-afternoon window.

Related in Northwood: EICR, legionella risk assessments, electrical work and EPC.

PAT Testing in Northwood: your questions

Not answered here? Call 0203 667 1333 and ask.

Does Hillingdon require annual PAT testing for HMOs?

Not in those words. The application form asks for a PAT certificate dated within the last 12 months, and the proposed conditions let the council demand a PAT report within 14 days. National law sets no fixed interval, so the licence paperwork is what drives the date.

Do I need PAT testing for a family let in Northwood Hills?

No law requires it for a single-household let. You must still make sure anything you supply is safe, and for a furnished house a dated test record is the simplest way to show that if something goes wrong.

Do I test my tenants' own appliances?

No. Their laptops, hair straighteners and kettles are their responsibility. We test what you supplied and note anything of theirs that looks dangerous or is plugged into your leads.

Can you PAT test a furnished Moor Park let?

Yes. Hillingdon's licence does not apply in Moor Park, which is in Three Rivers, but the duty to keep supplied appliances safe is the same. Ask Three Rivers whether its own HMO rules apply if you let to sharers.

What do I get after a Northwood PAT visit?

A certificate and a register on the day, listing each item by room with its result. Passed items are labelled. Anything that fails is listed with the reason, and is taken out of use or repaired with your agreement.

Book PAT testing in Northwood

Most quotes are settled on a two-minute call. Or send the form and we will call you back.

0203 667 1333
  1. We confirm the quote for your property
  2. We book a time slot that suits you or your tenant
  3. Each appliance is tested and the register issued
Thank you, your request has been sent. We will call you back on the number you gave, during our opening hours.

We use your details only to reply to this enquiry.

Visit the office

EliteShires Property Services
6 Station Parade, Kenton Lane
Harrow HA3 8SB

Call or WhatsApp

0203 667 1333
WhatsApp 07534 813123

Opening hours

Mon – Fri · 8:00 – 18:00
Saturday · 9:00 – 16:30
Sunday · Emergencies only

Chat on WhatsApp